The MP10HQ58KW Hybrid Full installation Integrated Containerized Solar Power Generation System is a mid-scale, fully integrated mobile power station engineered to deliver 58 KW of reliable, renewable electricity at project sites where performance cannot be negotiated and infrastructure cannot be assumed. Designed for operators who need more than a compact unit but require the same speed and simplicity of deployment, the MP10HQ58KW bridges the gap between entry-level portable power and large containerized energy systems.
Housed in a standard 10HQ high-cube container measuring 2991 × 2438 × 2896 mm, the complete system is factory-assembled and pre-wired before shipment. All 92 high-efficiency TOPCon solar panels (650–670 Wp each), DC cable harness (PV1-F 1×4), and 46 adjustable mounting brackets are installed and factory-tested as a single enclosed unit — eliminating on-site integration entirely and enabling full commissioning within one working day of arrival.
Once deployed, the 92-panel array spans a total footprint of 110.4 × 2.4 × 1.1 meters and immediately begins generating clean power at rated capacity. The 46-section racking structure supports ±15° angular adjustment (10–20°), giving operators precise control over panel orientation to maximize irradiance capture regardless of how the container is positioned on site. True to its hybrid designation, the system is engineered to connect with battery energy storage banks and diesel backup generators, enabling seamless switching between solar, storage, and generator modes for uninterrupted power supply around the clock and in all weather conditions.
With its 10HQ format compatible with standard flatbed road, rail, and sea freight, the MP10HQ58KW deploys as quickly as it relocates — making it the energy platform of choice for construction camp power supply, mining site operations, military forward bases, telecommunications cluster power, and disaster relief staging areas where 58 KW of hybrid-ready, zero-emission solar power needs to be operational from day one.
| Model | MP10HQ58KW | |
| Container | Type of Container | 10HQ |
| External Dimensions (L*W*H/mm) | 2991*2438*2896 | |
| Solar Panel | Solar Module Type | Topcon |
| Max. Power (Pmax/Wp) | 650-670 | |
| Product Dimensions (mm) | 2382*1134*30 | |
| Quantity of Solar Module (pcs) | 92 | |
| Bracket | Angle of Unfolding Bracket (°) | 士15(10-20) |
| Quantity of Bracket (Page) | 46 | |
| Overall expanded dimensions (L*W*H/m) | 110.4*2.4*1.1 | |
| DC cable | preinstallation | PV1-F1*4 |
Yes. The solar container can be integrated with the customer's existing diesel generator set. An ATS or STS can be used for system switching and control, depending on the specific site conditions and project requirements.
Deployment takes approximately 2 hours, while packing up the system takes about 1 hour. A team of 3–4 trained workers is typically required.
The current design is intended for approximately 10 deployment and folding cycles per year. For applications requiring more frequent deployment, the container body, structural components, and connection points can be redesigned for greater durability. The rails are made of zinc-aluminum-magnesium alloy.
Once the folding frames are fully extended and secured, locking pins are inserted into the square holes at the hinge ends. Steel cables connect the locking pins to ground anchors, with tensioners used to adjust cable tension.
For soft ground such as soil or grass, ground anchors can be driven directly into the ground. For concrete surfaces, the steel cables can be secured to hooked expansion bolts anchored into the concrete.
The deployed system is estimated to withstand winds up to Beaufort Force 12. Ring-type locking pins are inserted into the square holes on the sides of the frames and connected to ground anchors using steel cables and tensioners.
For soft ground, ground stakes can be driven directly into the soil. For hard surfaces such as concrete, the system can be secured using suitable anchoring or counterweight solutions.
The PV modules are mounted within the folding frames. Once the frames are folded into the container, limit pins at the top of the container secure each frame section in place.
Wooden support blocks are then placed underneath the frame to keep the wheels off the container floor, helping prevent axle deformation caused by vibration and road impact during transportation. Shock-absorbing foam is also placed over the outermost PV modules to protect the glass from impact and damage.
Yes. The installation area should meet certain ground-level requirements.
The level tolerance between the two transverse support points is ±5 cm over a distance of approximately 2.4 m. For the two longitudinal support points, the tolerance is ±10 cm over approximately 3.54 m.
When fully deployed, the system extends approximately 90–100 m. Using the container position as the reference level, the recommended elevation tolerance over the full 100 m length is within ±50 cm.
We provide technical support for system deployment and dismantling, including illustrated installation guides, video tutorials, and remote technical assistance.
Routine maintenance and day-to-day deployment are handled by the purchaser. At present, we do not provide continuous on-site O&M services, but our technical team remains available for remote support when needed.
Ampora Technology Co., Ltd. is MP10HQ-58KW Hybrid Full Installation Integrated Containerized Solar Power Generation System Suppliers in China.
Yes. We offer customization based on specific project requirements, including power capacity, system appearance, intelligent monitoring, backup diesel generator interfaces, special communication protocols, and other system configurations. Custom MP10HQ-58KW Hybrid Full Installation Integrated Containerized Solar Power Generation System.
Once the technical requirements are confirmed in the contract, our team will evaluate the project and develop a suitable configuration to meet the agreed performance and functional requirements.
A mining camp in a remote area runs eight hours of diesel generation every day just to power lighti...
A project engineer comparing bids for grid-tied storage often finds that the battery cost is only h...
Ampora Technology Co., Ltd., a company specializing in mobile photovoltaic (PV) and energy storage t...
When the equipment spec for a new solar power room called for a 20 ft container, the survey crew st...